Monday 16 January 2012

Batcave Update: Renovated 3rd Floor

I thought i'd post a new update today, to let you all in on what has happened with the development of the Batcave in the last 24 hours.
Added Features
*Added the Telephone to the 3rd floor, mounted on a hinge brick so when flipped back it reveals the switch/button to the Elevator/Secret Clock Door.
*Added a clothes prop/hangar to the Changing area so Bruce Wayne can change to Batman.
*Swapped out 1x2 brown bricks on the base of the secret door/grandfather clock, replaced with a 1x6 brown brick to make the base stronger.
*Due to an unforeseen problem with the 3rd floor baseplate, an 8x11 plate I ordered wasn't taking so well to the 2nd floor support beams, i've swapped this out with the original plates i'd intended to use for the study, as a result the 3rd floor is now more secure, the entire plates for the 3rd floor were reconfigured.
*finished off the Elevator outer walls and main facade of the building, added the spire at the top.
*due to the swap around of plates on the 3rd floor balcony, the facade to the left of the clock has been extended by about 3 studs to cover the corner.

Here are the updated pictures.




As always to see this development in it's entirety it's best viewed on the project folder at Flickr.com here: http://www.flickr.com/photos/superiorraw/sets/72157628767065715/ 

No comments:

Post a Comment